Industrial demand
Bring the operating window of a site into the planning conversation.
Define the window
Demand flexibility starts with the site, not a graph. Identify the processes that can move, the acceptable interruption and who can approve a change.
Review with the site team
Capture an explicit return-to-normal plan and keep an owner for exceptions. A useful portfolio view makes these limits visible beside energy availability rather than hiding them in a separate spreadsheet.
Illustrative field note. Not a customer case study.